Laserfiche WebLink
r <br />11 <br />TH 12 Meeting <br />9-2-98 <br />Page 2 <br />Q. Is the pedestrian bridge at current railroad grade or higher than current <br />railroad grade. <br />A. We will have to build it up by approximately 9 feet. <br />Q. <br />A. <br />What is the possibility of a 2"^ crossing near the Wolf property. <br />Tom assured them that the area they were concerned about almost <br />certainly would not be used for a 2"^ crossing. <br />Q. <br />A. <br />Did Long Lake City Council look at the pedestrian crossing and bike <br />trails? <br />Tom answered, Yes. If the townhouses weren ’t there the bike trails would <br />go straight. <br />ITEM:Construction Staging <br />Tom went through the possible construction staging and pointed out on the layouts. <br />Also pointing out that the railroad can only be closed for a couple of hours, so building as <br />much of the RR grade embankment as possible is necessary. See attached possible <br />staging. <br />NEXT MEETING CANCELED <br />October 7,1998 <br />5:30 PM <br />Orono City Hall <br />Recorder: Carol Slipy