Laserfiche WebLink
-•# <br />Draft Work Plan for the Update of the City's Comprehensive Plan <br />May 15, 1998 <br />Page 5 <br />4. The City needs to ensure it can maintain control of density once sewer is <br />made available. <br />IV. Transportation. <br />A. The transportation element of the current Comprehensive Plan focuses on pulling <br />traffic away from County Road 15 to McCulley Road and Highway 12. The <br />proposed upgrade of Highway 12 accomplishes this goal. <br />1. The proposed Highway 12 upgrade addresses a number of transportation <br />issues. <br />Sf. It <br />c. <br />Pulls traffic away from County Road 15. <br />The County Road 6 overpass at Highway 12 improves east/west <br />traffic flow on the north side of the City. <br />The proposed new Highway 12 addresses the main east/west traffic <br />flow problem. <br />:ir. <br />2.Local traffic movement. <br />i# <br />a. Review the transportation system within Orono to determine if all <br />local traffic needs are met. <br />1) Moving local traffic east and west of downtown Long Lake. <br />2) Impact of closing Stubbs Bay Road at Highway 12. <br />3) Impact of closing Townline Road at Highway 12. <br />4) Analysis regarding the request to cul-de-sac Orchard Park <br />Road. <br />V- '.--ir <br />- M- <br />Plan for "old" Highway 12. <br />a.Local circulation. <br />b. Significant east/west transportation route. <br />c."Main Street".