My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. <br />3. <br />Upon commencement of building construction on the site, the City council will <br />take formal action to vacate the portion of Navarre Lane as provided in City <br />Council Resolution #3830. Applicant shall upon said vacation grant to the City <br />utility and drainage easements over the entire width of right-of-way being <br />vacated. Upon said vacation, applicant shall take all necessary action to legally <br />combine the vacated roadway with the property. <br />The sidewalk connection to Olive Avenue as shown on the approved site plan <br />shall be constructed and maintained permanently by applicant/property owner to <br />provide pedestrian access through the site between Shadywood Road and Olive <br />Avenue. Applicant shall grant to the City the following easements: <br />a. A 10' wide trail easement over the portion of said sidewalk located <br />between the front facade of the building and Olive Avenue. <br />b. <br />it 4. <br />5. <br />6. <br />A trail easement 10' in width along the easterly boundary of the <br />property abutting Navarre Lane, <br />It is the intent of the City that although the City is being granted such <br />easements, the walkway within applicants property shall be mainatined by the <br />property owner, not the City. All upkeep, maintenance and snow removal <br />activity shall be the responsibility of the property owner. <br />The parking lot shall be paved with concrete curb and gutter, driving lanes within <br />parking lot shall have a 9-ton pavement section for trucks. A geotechnical <br />evaluation of the soil shall be done in conjunction with the pavement design. <br />Applicants' architect shall submit final development plans to the Metro Council <br />Environmental Services to determine the exact number of SAC units to be <br />charged at the time of the issuance of a building permit. The City will also <br />determine if additional Sewer and Water Unit Adjustment Charges and'or system <br />upgrade connection charges will be required for the new development, to be paid <br />by applicant prior to issuance of the building permit. <br />Appropriate traffic and parking signage shall be installed subject to the Orono <br />staff and City Engineer's review'. Signage and cross hatching of crosswalk for <br />the pedestrian walkway crossing of the drive-thru lane exit at the north end of <br />the building will be required. Fire lanes shall be designated during the building <br />plan review process and identified appropriately. <br />Page 8 of 11
The URL can be used to link to this page
Your browser does not support the video tag.