My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. <br />9. <br />10. <br />11. <br />12. <br />13. <br />The landscape areas ^ shown on the above referenced site plan shall consist of <br />grass wherever feasible and shall adhere to the above referenced Revised <br />Landscape Plan dated 2/2/98 in regards to planting species, sizes and locations. <br />Landscaping plan shall include placement of a minimum 6" depth of topsoil over <br />all areas to be vegetated. Applicant shall permanently maintain all landscape <br />areas as originally approved. <br />Site frontage for commercial signage calculation will be limited to the frontage <br />along Shadywood Road, being 381 feet in length. Signage for this site shall be <br />regulated by the provisions of Zoning Code Section 10.61, Subd. 1, Subd. 3(A) <br />and Subd. 3(D). No commercial signage will be allowed along the facade of the <br />building facing Olive Avenue e.xcept as minimally needed to identify service <br />entrances to buildings, and as needed for the bank drive-thru. <br />Final lighting plan shall be subject to City staff approval and shall locate lighting <br />so as to direct lights away from the adjacent residential neighborhood. <br />No business shall have its primary entrance through the rear (Olive Avenue side) <br />of the building. <br />No formal approval for reciprocal parking agreements between this property and <br />adjacent commercial properties has been requested or approved for this site. <br />Erosion control shall adhere to "Best Management Practices for Protecting Water <br />Quality in Urban Areas". All erosion controls as required by the City shall be <br />in place prior to commencing excavation on the site. The stormwater pond <br />constmetion shall be substantially completed and functional prior to construction <br />of building footings. <br />A De\elopers Agreement shall be executed by the applicant to assure that all <br />required site improvements as shown on approved site plan will be completed <br />to the Citys satisfacticii. The City Engineer has provided a preliminary' estimate <br />of the cost of site improvements at $169,100. This amount does not include the <br />cost of landscaping and plantings, which shall be in addition to the preliminary <br />Page 9 of 11
The URL can be used to link to this page
Your browser does not support the video tag.