Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON MARCH 9,1998 <br />(#\ \ - #2341 Daniel J. Anderson - Continued) <br />The proposed radius of the road is requested at 125'. The 275' radius requirement would <br />impact the property's topography, lot layout, and septic sites. Gaffron noted that Lots 4, <br />5, and 6 are riparian lots meeting the required setbacks but will require average lakeshore <br />setback variances. <br />The property is affected by the bluff impact zone. Grading is being proposed for a walk­ <br />out building pad for Lot 6. Gaffron reported that no grading is allowed in the bluff <br />impact zone. <br />The Planning Commission has asked for a 15' easement for a trail along the eastern <br />boundary of the property. The Planning Commission has asked to keep options open <br />regarding the trail location along Old Crystal Bay Road. It is currently proposed for the <br />east side of the road If the trail were to be placed along the boundary' of the subject <br />property, there are a couple of locations where the septic sites would be encroached. <br />Gaffron indicated that the Planning Commission has requested a tree, woodland, and <br />vegetation preservation easement be placed on the property, especially in the bluff area <br />1 he applicant has e.xpressed his desire to maintain the naturalness of the lakeshore area <br />The concern is with future property owners wanting a view corridor to the lake. A draft <br />ordinance is included in the packet for an easement. <br />Gaffron indicated that Hennepin County has asked for an additional T of right-of-way. <br />The Comprehensive Plan stipulates that a scenic parkway only requires 66' of right-of- <br />way, and Stafl'recommended that no additional right-of-way be required The current <br />right-of-way is 66'. <br />Gaffron reported that no stormwater ponding has been proposed. Conceptual direction <br />should include the stormwater pond and address the drainage issues noted by the City <br />Engineer Gaffron indicated that if the layout is changed, the Council may want to send <br />the application back to the Planning Commission for further review. He said the <br />preliminary plat should be revised to eliminate any grading of the bluft'impact zone. <br />Gaffron noted that final septic designs are needed The testing has taken place. Gaffron <br />felt there were suitable sites for septic and may include some trench systems. <br />Gaffron reported that an extension up to 120 days is a result of the request for a lot width <br />variance. <br />Jabbour questioned how the application got this far in the process without any mention of <br />a stormwater pond Gaffron indicated that the applicant has known all along that <br />stormwater ponding was part of the review process Jabbour asked that Staff sera <br />letter to the Watershed District notifying them that the City of Orono will not allow cash <br />contributions towards ponding but mitigation must take place on site.