Laserfiche WebLink
Orono - Equipment Garage Addition <br />Orono , MN <br />5/9/2024 <br /> EXTENDED COST DESCRIPTION <br />ESTIMATE <br />DOORS & FRAMES 5,750.00$ <br />Remove and Reinstall Existing OHDs <br />JOINT SEALANTS 910.50$ <br />Expansion Joint Sealants <br />GYPSUM BOARD WALLS AND CEILING 5,544.00$ <br />Furnish and Install Level 5 Drywall <br />PAINTING 2,430.00$ <br />Furnish and Install Paint at Interior and Exterior Walls <br />PLUMBING 1,500.00$ <br />Furnish and Install Floor Drain ???? <br />ELECTRICAL 4,950.00$ <br />Lighting Relocation <br />SUBTOTAL 140,935.30$ <br />Building Permits, SACWAC 2,114.03$ <br />Building Permits <br />SACWAC - By Owner <br />Profit and Overhead 26,464.13$ <br />Profit and Overhead <br />Construction Contingency -$ <br />Project Contingency <br />CONSTRUCTION COST TOTAL 169,513.46$ <br />Dering Pierson Group, LLC | 22401 Industrial Blvd, Rogers, MN 55374 | 612.325.9450 Page 2 of 3 220