Laserfiche WebLink
Orono - Equipment Garage Addition <br />Orono , MN <br />5/9/2024 <br />GENERAL CONDITIONS 28,951.60$ <br />Insurance <br />Performance and Payment Bonds <br />Builders Risk <br />Project Manager <br />Superintendent <br />General Labor <br />Dumpsters <br />Testing and Special Inspections <br />Sanitary Unit <br />Small Tools & Consumables <br />Surveying <br />Final Construction Clean <br />DEMO 1,840.00$ <br />Demo Existing Concrete SOG <br />SITE WORK 16,760.00$ <br />Furnish and Install Erosion and Sendiment Controls <br />Footing Excavation <br />Rough Grading <br />Finish Grading <br />Relocate Utility Hand Hole ??? <br />CONCRETE 15,677.20$ <br />Furnish and Install 6" Reinforced Concrete SOG <br />Furnish and Install Poured Strip Footing <br />Furnish and Install Concrete Apron <br />MASONRY 9,845.00$ <br />Furnish and Install 12" Reinforced CMU Foundation <br />Insulation on Both Sides of the Foundation Wall <br />CARPENTRY 38,664.00$ <br />Furnish and Install 2x6" Wood Framing @ 16" O.C. <br />Furnish and Install Wood Roof Trusses <br />Furnish and Install 3/4" Plywood Sheathing <br />Furnish and Install Wood Blocking <br />. <br />THERMAL AND MOISTURE PROTECTION 8,113.00$ <br />Furnish and Install R-20 Batt Insulation at Framed Walls <br />Furnish and Install R-49 Batt Insulation at Ceiling <br />Furnish and Install Spay-foam Insulation <br />Furnish and Install 1.5" Ridgid Insulation at Exterior <br /> EXTENDED COST DESCRIPTION <br />ESTIMATE <br />Dering Pierson Group, LLC | 22401 Industrial Blvd, Rogers, MN 55374 | 612.325.9450 Page 1 of 3 219