My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-13-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 10:28:20 AM
Creation date
5/10/2024 12:39:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono - Equipment Garage Addition <br />Orono , MN <br />5/9/2024 <br />GENERAL CONDITIONS 28,951.60$ <br />Insurance <br />Performance and Payment Bonds <br />Builders Risk <br />Project Manager <br />Superintendent <br />General Labor <br />Dumpsters <br />Testing and Special Inspections <br />Sanitary Unit <br />Small Tools & Consumables <br />Surveying <br />Final Construction Clean <br />DEMO 1,840.00$ <br />Demo Existing Concrete SOG <br />SITE WORK 16,760.00$ <br />Furnish and Install Erosion and Sendiment Controls <br />Footing Excavation <br />Rough Grading <br />Finish Grading <br />Relocate Utility Hand Hole ??? <br />CONCRETE 15,677.20$ <br />Furnish and Install 6" Reinforced Concrete SOG <br />Furnish and Install Poured Strip Footing <br />Furnish and Install Concrete Apron <br />MASONRY 9,845.00$ <br />Furnish and Install 12" Reinforced CMU Foundation <br />Insulation on Both Sides of the Foundation Wall <br />CARPENTRY 38,664.00$ <br />Furnish and Install 2x6" Wood Framing @ 16" O.C. <br />Furnish and Install Wood Roof Trusses <br />Furnish and Install 3/4" Plywood Sheathing <br />Furnish and Install Wood Blocking <br />. <br />THERMAL AND MOISTURE PROTECTION 8,113.00$ <br />Furnish and Install R-20 Batt Insulation at Framed Walls <br />Furnish and Install R-49 Batt Insulation at Ceiling <br />Furnish and Install Spay-foam Insulation <br />Furnish and Install 1.5" Ridgid Insulation at Exterior <br /> EXTENDED COST DESCRIPTION <br />ESTIMATE <br />Dering Pierson Group, LLC | 22401 Industrial Blvd, Rogers, MN 55374 | 612.325.9450 Page 1 of 3 219
The URL can be used to link to this page
Your browser does not support the video tag.