Laserfiche WebLink
Orono - Equipment Garage Addition <br />Orono , MN <br />5/9/2024 <br /> EXTENDED COST DESCRIPTION <br />ESTIMATE <br />CLARIFICATIONS <br />1. Work to be done during normal business hours. <br />2. Estimate is good for 15 days. <br />3. Owner shall obtain and pay for all permit drawing costs. <br />5. No winter conditions have been included in this estimate. <br />6. Any added scope not listed in the scope detail above will be an added cost to the Project/Owner. <br />7. Any work noted on the drawings that is not referenced in the spec has been excluded in our proposal and will <br />result in a Change Order. <br />Estimate prepared by Tim Ekblad <br />tekblad@deringpierson.com <br />651-968-6308 <br />Dering Pierson Group, LLC | 22401 Industrial Blvd, Rogers, MN 55374 | 612.325.9450 Page 3 of 3 221