My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1992 Council Packet
Orono
>
City Council
>
1992
>
08-24-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:01:59 PM
Creation date
4/9/2024 2:58:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
North Shore Drive Marina <br />August 10r 1992 <br />Page 2 of 3 s t* fv) e <br />3. The maximum permitted totalyv^boat density on the <br />property, including wet slips, dry slips and on-land storage <br />of boats stored for any purpose is 151 boats. <br />4. Maximum permitted winter boat density (includes on <br />land, racks, and boats stored in the lake under deicing <br />measures) is 100 for the current season. Maximum winter <br />boat density for any given year is 122. ^ <br />5. Applicant shall provide c winter storage site plan <br />defining the location of required winter parking spaces and <br />the location of winter stored boats. <br />6. Applicant is advised that a license for the 1993 <br />license year will not be issued until the following <br />requirements have been meet: <br />a. Agree to acceptable time frame for completing <br />plantings required per the attached landscape plan <br />which identifies plantings required in the past but <br />which have never been completed. <br />b. Likewise, licensee shall agree to a time frame for <br />removal of gravel areas between the drystacks and the <br />road, such gravel to be replaced with sod. <br />c. Licensee shall provide photo documentation of the <br />gravel area west of the lagoon existing prior to the <br />1984 service building variance review, or shall agree <br />to a time frame for reverting such gravel area to <br />grass. <br />d. Applicants shall further agree to constructing and <br />maintaining a minimum 10' grass buffer along the lagoon <br />border and all shoreline areas. <br />e. Licensee shall agree i_o a time frame for <br />development of a drainage detention pond, included <br />regrading of the property as necessary to maximize the <br />portion of hard surface areas flowing to that pond. <br />f. Licensee is encouraged to at the earliest possible <br />opportunity, riprap the lagoon and shoreline where <br />lakeshore bank erosion is occuring. <br />7. Licensee shall provide an updated parking plan that <br />includes dociamentation of how charter boat customer parking <br />is handled. <br />8. Licensee shall legally combine the 3 tax parcels before <br />any further building permits will be issued.
The URL can be used to link to this page
Your browser does not support the video tag.