Laserfiche WebLink
an Ertiergency Operations Center complete with multiple phone jacks <br />to facilitate communication with multiple agencies during an <br />emergency <br />Public Works Facility <br />The 27,000 square foot Public Works facility provides storage fcr <br />the Public Works maintenance vehicles and equipment. The facility <br />al: .. includes a number of work areas such as a sign shop and <br />welding bay and vehicle maintenance bay complete with hydraulic <br />lifts. The heating and ventilation system have been planned for <br />energy efficiency and to ensure a healthy work environment. <br />All buildings have a fire suppression sprinkler system. They also <br />meet the accessibility requirements of the Americans with <br />Disabilities Act. <br />How we got here <br />Initial discussions concerning the need for new city facilities <br />began in 1972 when the house being used for all city departments <br />was determined to be inadequate and unsafe. Before plans to build <br />a new facility were begun, the City decided to purchase the <br />building next door, which had been used as an upholstery shop with <br />living quarters upstairs. While the first floor required some <br />remodeling, the upstairs apartment was left basically unchanged. <br />This resulted in staff being located in the following rooms: <br />1. The City Administrator's office was located in the master <br />bedroom. One could tell this was the master bedroom