Laserfiche WebLink
\)VCHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AiA DOCUMENT C701/CM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROJECT: Orono City Hall and <br />(name,address) Public Works Buildings <br />TO (Contractor): <br />Swanson and Youngdale <br />P.O. Box 26070 <br />Minneapolis, MN 55426 <br />CHANCE ORDER NUMBER: <br />INITIATION DATE: January 8, 1993 <br />ARCHITECT'S PROJECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: <br />CONTRACT FOR: <br />CONTRACT DATE: <br />4059 <br />Painting arid <br />WalIcovering <br />May 11, 1992 <br />You are directed to make the following changes in this Contract: <br />Furnish additional labor and material <br />required according to revisions to plans <br />and specifications as noted in Proposal <br />Request No. 7 - Revised, Proposal Request <br />No. 8, and Proposal Request No. 23.Total Deduct: ($99.00) <br />Not valid until s gned by the Owner, the Architect and the Construction Manager <br />Signature o( the Contractor indicates agreement herewith, including anv adjustment in the Contract Sum or the Contract Time <br />The original (Contract Sum) (Guaranteed Maximum Cost) was................................................. $ <br />Net change by previously authorized Change Orders ................................................................ j <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ............... $ <br />The (Contract Sum; (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order ............................................................................................................ $ <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />Recommended: <br />24,894.00. <br />-0- . <br />24,894.00. <br />(99.00) <br />24,795.00 <br />CONSTRUCTION MANAGER <br />Minneapolis, MN 55404 <br />ADDRESS\ <br />f'fV ‘13BY \J DATE <br />Agreed To: <br />Swanson and Younqdale <br />contractor <br />.Mi nneai/ba i s , .MN 55426—/7^ <br />BV J f / <br />A <br />A Tt <br />( ) Days. <br />December 31, 1992 <br />Approved <br />Boc^rman roos Pfister and Arsociates <br />ARCHirECT <br />MitHTeap c/i 1 <br />DYE <br />J <br />Authorized: <br />City of Orono <br />OWNER <br />Crystal Bay , MN 55323 <br />ADDRESS <br />DATE <br />CAUTION. You should sign an original AIA document which has this caution printed In red. <br />An original assures that changes will not be obscured as may occur when documents are reproduced. <br />*«A OOCUMINT CrtITAS • CHXSCt • COSSTHtCTtON wAS.CfvtvT EO'TlCS « i'_S£ ’SSO tOlTIOs • XiAt <br />t )s« • TMt AvrticAs issTiTcn o» a «chit {cts , vjs Ntw 'Otx ‘vtsti % a A*SM(>croN uc ima C701/CM — 19t9 <br />|»M!ecofiyin9 vtolaiti Ui. copy^lgM and to iogol pwoocufion