My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-1993 Council Packet
Orono
>
City Council
>
1993
>
02-08-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 1:10:48 PM
Creation date
2/12/2024 1:06:21 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C701/CM <br />PROJECT:Orono City Hall and <br />(name, address) Public Worlds Buildings <br />TO (Contractor): <br />Aclcley-Dornbach, Inc. <br />P.O. Box 13036 <br />Wauwatosa, WI 53213 <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />CHANCE ORDER NUMBER: ^ ^ ^ <br />INITIATION DATE: January 6, 1993 <br />ARCHITECT'S PROJECT NO:1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: *^059 <br />Detention Hollow Metal, <br />CONTRACT POR:Haj-(^v\rare and Equipment <br />CONTRACT DATE: August 31, 1992 <br />You are directed to make the following changes in this Contract; <br />1. Add to contract for cost of performance <br />and payment bonds not included in <br />original bid price. <br />2, Add to contract for revisions to bullet <br />resistent frames and security doors as <br />noted in AcJcley-Dornbach letter dated <br />October 9, 1992. <br />Add;335.00 <br />Add: $1,117.00 <br />Total Add: $1,452.00 <br />Not valid until signed by the Owner, the Architect and the Construction Manager. <br />Signature of the Contractor indicates agreement herewith, including anv adjustment in the Contract Sum or the Contract Time <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ..................................................... $ <br />Net change by previously authorized Change Orders ...................................................................... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ................ S <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order ..................................................................................................................... $ <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefo^is <br />31.000. 00 <br />-0- • <br />31.000. 00' <br />1,452.00 <br />32,452.00 ‘ <br />December 31^, 199^^*'^*’ <br />Recommended; <br />CONSTRUCTION MANAGER <br />Minne^olis. MN 55404 <br />AOD«SS _ <br />" C'DATE <br />Agreed To: <br />A(')clcy-Dornbach. Inc. <br />CONTRACTOR <br />Wauwatosa. WI 53213 <br />ADDRESS ^ •/' <br />ytj j*^/'.y/j.*. <br />Approved; <br />Boarma n <br />ARCHITECT <br />Min <br />os Pfister and Associates <br />MN 55401 <br />authorized: <br />City of Orono <br />OWNER <br />Crystal Bay, MN 55323 <br />ADDRESS <br />4^ <br />DATE DATE <br />CAUTION You Should sign an original AIA document which has this caution printed in red <br />An original assures that changes will noi be obscured may occur when documents are rtproduced. <br />AtA DOCt'MINi C791 CM • CHASCI ORDER • CONSTRUCTION MANAClMfST tOiTlON • »LNf fL' TiQN • a :a # <br />® 11t0 • the AVURiCAS INSTITCTI Of A«<.HlTfC^S IMS SEW >(.'RX AVfNUC SW AASHiNC^Os DC :xn>» <br />WARNIM UfMtc #n»#e photoc oRyMg vfoiMt U S coRynghi 'mm ane tt Rufc|>ct to Mgat piiMi€y1to#i <br />C701/CM —1980
The URL can be used to link to this page
Your browser does not support the video tag.