Laserfiche WebLink
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C701/CM <br />Distribution to; <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROjECT: Orono City Hall and <br />(name, address) Public V^/orks Buildings <br />TO (Contractor): <br />Gephart Electric Company <br />3600 LaBore Road <br />St. Paul, MN 55110 <br />CHANGE ORDER NUMBER: Two ( 2 ) <br />INITIATION DATE: January 6, 1993 <br />ARCHITECT'S PROjECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: 4059 <br />CONTRACT FOR: Electrical <br />CONTRACT DATE: May 11, 1992 <br />You are directed to make the following changes in this Contract; <br />Deduct from contract amount for items <br />1-7 listed on attached sheet.Total Met Deduct: ($3,708.00) <br />Not valid until signed by the Owner, the Architect and the Construction Manager <br />Signature of the Contractor indicates agreement herewith, including any adjustment m the Contract Sum or the Contract Time. <br />279.400.00 <br />(9,267.00) <br />270.133.00 <br />The original (Contract Sum) (Guaranteeo Maximum Cost) was.................................................. $ <br />Net change by previously authorized Change Orders ....#1.................................................... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ............... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order ............................................................................................................. S <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />The Cont'act Time will be (increased/ (decreased) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of this Change Order th^fore is December 31, 1992 <br />(3,708.00) <br />266,425.00 ’ <br />Recommended: <br />Kraus-Anderson Construction Compan y <br />CONSTRUCTION MANAGER <br />Mi nnaannl 1 «;. MN 55 4 04 <br />ADDRtSV A; <br />Approvei <br />n Kroos Pfister and Associates <br />MN 55401 <br />i-m ^ > <br />DATE <br />Gnnharti ElGctiri/t: Cq <br />CO nt H aj .-tor y // t / ^.------J <br />DATE <br />Authorized: <br />CitV of Orono <br />/ate <br />OWNER <br />Crystal Bay. MN 55323 <br />ADDRISS <br />DATE <br />CAUTION: You should sign an original AIA document which has this caution printed in red. <br />An original assures that changes will not be obscured as may occur whan documents are reproduced. <br />AtA OOCUMINT CM e CHASGl OROEt • CON^IRLCTiUS MA'^AClMlsf IDinos • ILM '960 fDlTlUS • AIA* <br />t • -Mt AMERICAN ISSTITLTI Of ARCHITKTS K15 NlA >0«A AVlSCl NW WASHINGTON (J C 2COJt C701/CM —1980 <br />WARNINQ UrMtc*<iMO pKowcoeyiw9 vtolatM US coey ngN and >• «ubi»ct lo l*9ai pMMcution