Laserfiche WebLink
Zoning File ffiSlS <br />November 9, 1993 <br />Page 2 <br />Hardcover facts have been provided by applicant recording property in its combined state <br />and at the time of a future subdivision. Hardcover facts are reviewed as follows: <br />A. Combined property: <br />0-75’ setback area = 51.550 s.f. <br />Allowed = 0 <br />Proposed = 0 <br />75-250’ setback area = 112.150 s.f. <br />Allowed = 25% <br />Proposed = 16.508 s.f. or 14.72% <br />250-500’ setback area = 28.570 s.f. <br />Allowed = 30% <br />Proposed = 7.490 s.f. or 26.22% <br />B. Northern lot: <br />0-75’ setback area = 25.200 s.f. <br />Proposed = 0 <br />75-250’ setback area = 63.400 s.f. <br />Allowed = 25% <br />Proposed = 7.385 s.f. or 11.65% <br />250-500’ setback area = 3.820 s.f. <br />Allowed = 30% <br />Proposed = 600 s.f. or 15.7% <br />C. Southern lot: <br />0-75’ setback area = 26.350 s f. <br />Proposed « 0 <br />75-250’ setback area = 48.750 s.f. <br />Allowed * 25% <br />Proposed • 9.123 s.f. or 18.7% <br />250-500’ setback area = 24.750 s.f. <br />Allowed = 30% <br />Proposed * 6.890 s.f. or 27.84% <br />Access to the property is gained via the private driveway that currently serves the <br />MWee facility and the hmire park site. As a condition of the final subdivision approval, the