Laserfiche WebLink
• > <br />steininger <br />CONSTPUCnON COMB^NY <br />3070 SowlH Icaington Av^nut <br />5f. Povl. (fo«ofi) S5121 <br />iS4-19tO <br />March 10, 1992 <br />Page 2 <br />VI.Sidewalks: <br />1..fj' <br />2. <br />Strip and stockpile topsoil <br />425 cubic yards § $1.90 • *. . <br />(Add to above price if exported offsiue. <br />S5 50 - «1.90 = $3.60 X 432 yards - $1,d30.00) <br />import sand: 1,023 cubic yards ? S9.25 <br />Finish grade sidewalks and spread topsoil along <br />sides: <br />VII:Sewer and Water Lines, and Entrance Culvert; <br />No PIV's, add $1,000.00 each if required. <br />2. No SAC, WAC, permits, or ees <br />Bid to five feet of building line. <br />Cost <br />Cost of Bond <br />VIII. Sediment Holding Area <br />Remove one foot of topsoil and stockpile = <br />15,220 square feet x 1 = 564 cubic yards @ $3.90 <br />Pump water to dry area: <br />Grade excavated areas: <br />IX. Weir and Drainage Pine: <br />1. Using reinforced concrete pipe <br />2. Using corrugated metal pipe <br />Sincerely, <br />I Martin Steininger <br />• •• • • <br />807.00 <br />9.463.00 <br />1.025.00 <br />40,880.00 <br />950.00 <br />2,200.00 <br />1,800.00 <br />i-.4oo:oo <br />12.900.00 <br />11.700.00