Laserfiche WebLink
• <br />steininger <br />CONSTRUCTION COMPANY <br />3070 S0MfK A»«nM# <br />5f. 7«wl, fCo9«««) 35121 <br />454.1910 <br />Extra To Contract: <br />March 10, 1992 <br />Xraus-Anderson Construction Company <br />John Davies <br />525 South Eighth Street <br />Minneapolis, MN 55404 <br />Re* Orono City Hall and Public Works Garage: _ <br />Extra Costs due to changes in PRD 1.1 Gracing Plan, <br />dated 2-26-92 <br />I. king Lots: <br />III. <br />1 <br />2 StSei lower grade one foot: <br />70 X 30 X 1 = (78 cubic yards). <br />Net iiHOorti 663 cubic yards ? S9.*-5 ^ i ^ri <br />Difference in finish grades between new gracing plan <br />and original plan taking into consiaeration the <br />addendas and changes in the paved areas. <br />II. Geofabric: <br />1. <br />2. <br />3. <br />6,238 square yards § $1.00 <br />Add for water problem 9 50.25 deeo x <br />Extra oversize outside of curbs: . <br />2 feet wide x 1362 lineal feet = 15 <br />yards 9 $1.90 <br />178 cubic1. Strip and replace 1.5 feet topsoil <br />vards 9 $3.60 a ?! 252. i.nstall 356 squar® yards geofabric . <br />IV. Silt Fence: <br />1. 2,430 lineal feet 9 $2.25 <br />Base Material for Frontage Ro^. <br />1.RecycUd cuss V Base Material, <br />X 18 feet wide x 660 feet long - 420 tons . <br />$7.90 per ton in place. <br />i <br />$6,179.00 <br />28U31L. <br />^753 C. <br />640.00 <br />445.00 <br />5,467.00 <br />3,318.00 <br />6.238.00 <br />1.360.00 1 <br />^ .