My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-1993 Council Minutes HRA2
Orono
>
City Council
>
1993
>
05-24-1993 Council Minutes HRA2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 12:47:27 PM
Creation date
12/26/2023 12:46:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 <br />steininger <br />CONSTWXmON COMPANY <br />3070 S«m»H Aw»«m« <br />it. f»yl. (to9«"> Miwwfto <br />August Ilf 1992 <br />Kraus-Anderson Construction Co. <br />% John Davies <br />525 South Eighth Street <br />Minneapolis, MN 55404 <br />Re: Orono City Hall and Public Works Garage <br />Reguest for "Extra to Contract <br />1. April 20, 1992 <br />hours 950 Loac .r @ $81.00 <br />9 3/4 hours tandem truck (§ $45.00 <br />(Haul in 6 loads asphalt) <br />6 loads asphalt for road base S.E. drive of <br />Public Works garage @ $10.00 <br />2. <br />3. <br />4. <br />$ 283.50 <br />438.75 <br />60.00 <br />357.00 <br />$1139.2542 tons I-t" keystone @ 38.50 <br />Stablize southeast entra/^e^drive . <br />Area in northeast corner of site east of curb line by_^Salt^^ <br />^l^:^os^or^Se^^eotrx?u:^as estimated in the March 10, 1992 <br />request. The extra cost is estimated to be. <br />strip 1i feet topsoil x 4,488 sq feet = 249 yds 9 SI.90 <br />Import 2.25 feet sand x 4,433 sq feet 374 yds Q 35.25 = <br />$ 473.00 <br />3 460.00 <br />$3933.00 <br />Asphalt paving area by salt ^torage^area. ^^^This contract" <br />the updated plan. I ^ . specifications stated that the <br />quote dated March 10, T P inches of base under theLrthwork contractor shall place four ^^ches ot <br />paved area. In the original bid this was a g <br />7,500 sq feet of paved area x 4" base material <br />177 tons § $7.80 » $1380.00 <br />Police Building: Entry way, north side: <br />Subcut and lower footing for water line, <br />muck, and backfill with sand. <br />Grids K and 16. <br />Pump water, excavate
The URL can be used to link to this page
Your browser does not support the video tag.