My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1994 Council Packet
Orono
>
City Council
>
1994
>
04-11-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 2:15:09 PM
Creation date
12/8/2023 2:09:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono Property P.U.D. Submittal 5 November 1993 <br />Municbal sewer snd water service to the site would be provided by extension of <br />water id sewer mains from the existing facilities along Highway 12. It is propos^ <br />to extend the water and sewer mains along the west side of Willow Drive to the site <br />and then within the proposed streets r.o.w. within the site as required to service th <br />proposed lots. <br />B»«l on discossions wiU. th. Cit, EngU««. th. <br />caoacity to service the site. Temporary capacity is available in the sanitary sewer on <br />^hiwy 12 to service the site. However, ultimately a new <br />necessai on Highway 12 extending to the Long Lake treatn^ plan, -^e tniiA <br />_____ K« *h» nmnnaed develooment would fund a portion of thissewer assessments paid by the proposed develop <br />trunk sewer. <br />Stormwater Management <br />The stormwater runoff from the proposed streets and <br />conveyed by storm sewer to stormwater management basms for *^«**™®"* <br />control The majority of the lots are walkout type lots which back up to w^and <br />areas The rear yards would drain toward these weUands with Ae graces filterin^e <br />^ZTer and weUand protection enhanced by creating a natural buffer at be ^ <br />' edge. Because of the extensive onsite ponding, the project may not need the po <br />being proposed by MnDOT along Highway 12. <br />Site Grading <br />The site is relatively flat with the ground water uble close to the surface. In «<»eral. <br />the basement levels of the walkout homes would be estabhs^ close to the <br />, cooperative grading with the school property to the west is being J j <br />jjialMce both sites, develop ponds as needed, and prepare areas for athletic fields. ^ <br />3. Traffic A Circulation <br />TTie road system has been developed to best facUitate the movement of traffic safely <br />and conveniently in accordance with the City’s designated road system. <br />hierarchy of traffic with cul-de-sacs running into this collector. A private drive is n <br />proposed for three lots to minimize the impact on the woods. <br />^ if- ?
The URL can be used to link to this page
Your browser does not support the video tag.