Laserfiche WebLink
Orono Property P.U.D. Submittal 5 No' ftnber 1993 <br />IV. TENTATIVE STAGING & SEQUENCE SCHEDULE <br />The developer intends to develop the project in approximately two phases over a period of <br />approximatdy three to four years. Obviously, economic conditions may affect the actual time <br />frame and specific areas of development. This sequence is derived by the approximate <br />location of utilities which will serve the southern part of the property first. Undeniably, the <br />phasing will be heavily influenced by market conditions. <br />V. HNANCIAL CAPABILITY <br />Orono Center Properties, Properties owns the land free and clear. As the optionee. Lundgren <br />Bros, intends to develop the property once they receive every governmental approval <br />necessary for development to occur. <br />VI. NATURAL RESOURCE ANALYSIS <br />The topography is generally flat terrain with the highest elevation being 1,038.4 feet and the <br />lowest elevation being 1014.8 feet. There are sixteen separate wetlands on the site with the <br />Army Corp of Engineers and City of Orono having jurisdiction. A separate wetland report <br />has been field with the City. <br />The ±59 acre site is a mix of cultivated fields, wetlands, areas with miscellaneous vegetation <br />and some significant wooded areas. The developer has taken these features into consideration <br />in the planning of this neighborhood community. Much of the land has been under intense <br />agricultural practices with no water quality management. Sediments from cultivation and <br />farm chemicals presently drain directly into the wetlands. <br />In addition to these natural features, the development will include significant ponding and <br />some enhancement of existing wetlands and along with additional landscape elements proposed <br />by the developer, we believe the result will be an overall development that b attractive and <br />enduring. <br />Vn. WETLAND MITIGATION & ENHANCEMENT <br />The project contains a total of 10 acres of wetlands of various types. The sixteen wetlands <br />have been mapped and analyzed by Franklin Svobod^. Hb report b included for review. <br />Sedimentation ponds will intercept a.nd collect storm water runoff prior to dbcharging it into <br />the wetlands. The developer ’s intent b that upon its completion, the site should have greater <br />wetland acreage with overall higher quality than exbted prior to development. Thb should <br />provide an improved variety of plant types and a better habiut for more species of wildlife. <br />Also, the extensive ponding system will produce higher quality water than the untreated farm <br />runoff. <br />Compensatory mitigation for unavoidable wetland losses shall occur in the form of a wetland <br />creation system. This would provide a ratio of 2:1 acre for acre replacement of wetlands to <br />be affected by the project.