My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-1994 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1994
>
06-20-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 3:39:50 PM
Creation date
10/18/2023 3:34:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />» r <br />: <br />Zoning File #1933 <br />June 16, 1994 <br />Page 2 <br />M - Amended Filling Plan Requested by Corps <br />N - Plan of Applicant ’s Amended Fill Plan <br />O - Local Watershed Maps <br />P - Drainage-Dickey Property-Northeast Along Willow <br />Q-1-2 Inventory of Disturbed Areas/Mitieation Areas <br />R - MCWD Permit 5/3/94 <br />S - Preliminary Plans of Second Phase <br />Pertinent Facts for Second Phase Development <br />Dickey site - 11 lots <br />Total acreage = 26.04 acres exclusive of road right-of-ways <br />Coffin site - 10 lots <br />Total acreage = 29.6 acres (2.75 wet) exclusive of road right-of ways and driveway <br />outlot <br />These areas do not include wetlands Types 1 and 2 not included in conservation maps <br />of the City nor does it include the areas defined as mitigation wetland area. <br />Status of First Phase Subdivision and Permitting Processing <br />The first phase subdivision is in the process of being filed by the City. Accessory <br />documents are in the final stages of completion and ready for filing. The MCWD, or LGU for <br />the City, has granted comprehensive approval of the drainage and mitigation plans completed <br />during the first phase review. The DNR has completed its revie’^ of the impact of the proposed <br />total development on the Luce Line. All required improvements set forth in that review have <br />been included in the final plat approval resolution, review Exhibit F. Review Exhibits L, M and <br />N. During the Corps ’ comprehensive review of the 46 lot subdivision, Mr. Yanta advised that <br />if the applicant was to meet the requirements of a nationwide permit that filling within Lots 17 <br />and 18 would have to be reduced. The developer is concerned with the impact on the building <br />envelope and has submitted a request to reconsider their request to reduce the filling by .4 acre. <br />Review Exhibit M. Applicant has submitted the amended plan showing a reduction in the <br />amount of fill by .25 acres asking that the additional .15 acre of fill needed to provide a <br />reasonable separation between the wetland and the proposed home site. The developer has asked <br />that the nationwide permit be approved asking that Basin 1-A receive 2.03 acres of fill. Staff <br />will contact Mr. Yanta prior lo the meeting to see if he will approve amended proposal. In <br />conclusion, all reviewing agencies have reviewed the comprehensive drainage and grading plan <br />and have either provided conceptual approval or conditional approval. <br />The Park Commission has reviewed the 46 lot proposal. The City has approved the <br />comprehensive interior trail plan, review Exhibit H. The Park Commission has not been asked <br />to review the second phase subdivision.
The URL can be used to link to this page
Your browser does not support the video tag.