Laserfiche WebLink
Zoning File #1933 <br />June 16, 1994 <br />Page 3 <br />Review of Second Phase Subdivision <br />I jQt Configuration <br />All lots meet the required two acres of dry contiguous lands exclusive of designated <br />wetlands and retention treatment ponds. Note the designated wetland within Lot 16 has not been <br />shown as a drainage easement. The lot area should be amended to include total dry buildable <br />exclusive of wetland area. Lots 15 and 18 (Coffin property) do not meet the required width <br />along cul-de-sac. Lots 15. 16, 17, 18 and 19 (Dickey property) are classified as ^ough lots <br />and conditional use permits would be required for any accessory s^cture installed at some <br />future date. As already noted above in the factual findings. Lots 16 and 17 are served by a <br />driveway outlot that has been placed over an existing driveway that served the Coffin residence <br />within Lot 16. As in the first phase review, the road layout and driveway access <br />16 and 17 were concepnially approved by both Planning Commission and Council dunng e <br />sketch plan review phase. The issue of applicability must be addressed in this review. A loop <br />road connecting northern cul-de-sac road with Watertown Road would have a major impact on <br />the designated wetland. In the conceptual review of the application, the City deemed it^t <br />necessary to have a loop road connecting Old Crystal Bay Road to Watertown Road. The <br />installation of a private road within the area defined as Outlot C would also ™ <br />development, specifically adjacent to the existing driveway at the intersection of Watertown <br />Lad. ^he north side yard of Lot 17 should be adjusted to a 45’ width. Lot 15 s side setback <br />should be adjusted to 50 ’ adjacent to Outlot B (Coffin property). <br />rirading/Drainage/Wetlands_ <br />As already noted above in the status report, the only agency still to complete the re^ew <br />of the comprehensive grading and drainage plan is the Corps. Mitigation areas have teen <br />approved. The issue for the Corps is the resolve of the amount of fill to be placed within Lo <br />17 and 18 (Dickey property). <br />There was concern with drainage coining from northeast comer of Dickey parcel <br />eventuallv to the Luce Line. As noted by developer during the first ph^ Drive <br />pond is proposed within Lot 8 (Dickey). Drainage will dram from 1"'^ f" <br />dirough L DNR park under Luce Line via a 48” culvert that cames draimge throug h a swale <br />evenmallv south along Willow (review Exhibit P). The developer shall provide incre^ <br />Storage " apX at the northeast comer of the Dickey property to minimize any impact on <br />existing developed properties in Countryside neighborhood. <br />Parks/Trails/Park Dedicatioj <br />The City will ask for a park dedication fee for the second phase subdivision. Applicant <br />should Spond^to placement of interior trail within designated wetlands. We did not address