Laserfiche WebLink
TO: <br />FROM: <br />DATE: <br />Mayor and City Council <br />Ron Moorsc, City Administrator //^ <br />August 24, 1995 <br />SUBJECT: County Road 6 Update <br />inhere are two major areas of interest related to County Road 6 between Watertown Road and <br />Highway 12. One is the intersection of County Road 6. Watertown Road, and McCuIky Road. <br />Thie other is a potential first phase of an interchange at County' Road 6 and Highway 12. <br />County Road 6/Watenown Road Intersection <br />A plan showing the proposed design of the County Road 6/Watenown Road/McCulley Road <br />intersection is attached for the Council's review. The design provides for a continuous flow of <br />traffic on County Road 6. a continuous flow on V Culley Road nonh onto County Road 6, and <br />an indirect connection between County Road 6 and Watertown Road. The design sketch also <br />shows the impact of the new right-of-way on the residentia« nroperties. Because this is a <br />preliminary design sketch, the County has not made any rigi * 01-way cost calculations. <br />County 6 and Hi>?h\vav 12 Interchange <br />The Ci>unty has developed a preliminary design for a biif* ding an overpass for County <br />6 over Hichway 12 and • "button hook" connection from tl >. »»Jge back to Highw'ay 12 to <br />provide for all mming m'^sements currently occurring at the • alked intersection ot County <br />6 and Highway 12. This bridge would be the first phase ol an intercliange at County 6 and <br />Hichway 12. The bridge would provide a continuous flow of traffic along County Road 6 and <br />would be designed to serve as the bridge for the future full interchange. The current 6 and 12 <br />intersection and signal light would be moved to the new three-way intersection formed by the <br />button hook connection from the bridge to Highway 12. <br />The Council may want to schedule a wivrk session to discuss the two preliminary designs.