My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-1988 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1988
>
03-21-1988 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 4:21:32 PM
Creation date
9/14/2023 4:11:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MuniTBS OF ns PiAniaG comassioa nHG HELD n&KCH 21, 1988 <br />#1254 nillTF LOTHBIAH CBDICB COVTiainD <br />Paul Phillips, 2140 Sixth Ave. N., asked about the <br />impact of the parking lot lighting toward his property <br />of the Woodland property. <br />Craig Moleski stated that the lighting will not change <br />from what currently exists. <br />There were no other comments from the public and the <br />public hearing was closed. <br />Because of the weather conditions, Gaffron stated that <br />it may be difficult to do soil testing at this time. <br />Dick Brownlee proposed that their engineer furnish a <br />letter to the City which states that the site has <br />adequate area and the design of the system will be <br />adequate when the percolation tests can be done. <br />Staff recommended that applicant submit as much <br />information regarding the septic system as possible <br />prior to the first Council sieeting in April. <br />It was moved by Chairman Kelley, seconded by Johnson, to <br />recommend approval of the Commercial Site Plan Review, <br />conditional use permit, and variance per staff's <br />recommended conditions and findings, subject to resolve <br />of the septic system issue prior to review by the <br />Council. Motion, Ayes 4, Nays 0. <br />#1258 JOn 8 KATBT BHLBRT <br />1785 COKORDIA STREET <br />VARIAMCB/CCNn>ITI(»nL USB PERMIT <br />PUBLIC HEARING 9s38-9:59 <br />The Affidavit of Publication and Certificate of Mailing <br />were noted. <br />Jack Anderson and Nick Ruehl of EOS Architecture Corp. <br />were present representing the applicants. <br />Jacobs explained the request to construct a 2-story <br />living area addition and an addition of garage space. <br />To construct these additions the following variances are <br />requested: <br />1. Lakeshore setback - required 75', proposed 71'. <br />2. Side setback - required 10'- proposed 3.5'. <br />3. 0-75' Hardcover - allowed 0% - existing 533.4 <br />s.f. - proposed 576.4 s.f. <br />4. Average lakeshore setback
The URL can be used to link to this page
Your browser does not support the video tag.