My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-1996 Planning PacketC
Orono
>
Planning Commission
>
1996
>
11-18-1996 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 3:45:14 PM
Creation date
9/14/2023 3:39:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/. <br />V* <br />^ : <br />■V <br />if • <br />Proposed Development aU340 Shoreline Drive, Navarre <br />The puipose of this project is to build a st down, family restaurant, 4300 square <br />feet, with drive-thru food service. The fresh food and custard menu fits <br />somewhere between a McDonald/Burger King concept and a Perkins/Baker's <br />Square restaurant <br />The customer will order the food at one of the register order points. The food <br />will be delivered by staff to the table where the customer is seated. The <br />restaurant will contain seating for 99 customers. <br />We are going to combine this concept In the same building with an O'Sullivan <br />C-Store The restaurant and C-Store will utilize the same <br />utility/restroom core of the building. <br />Eight fueling points will be available under a full canopy. The brand of gasoline <br />will be the same as the present O'Sullivans across the street. The store will <br />offer a normal OStore selection of products Including coffee, cold drinks, <br />bakery, roller grill products ar»d cold sandwiches. <br />A mini-tunnel service car wash will be built on the site. The equipment will <br />include a conveyor system to puli the car through the ninety (90) foot car wash <br />Most of the equipment will be touchless spray applicators with a "shaker- <br />curtain" and quarter panel soft doth rollers. <br />This development exceeds the vehicle parking requirements for the proposed <br />US6d. <br />The development is Phase I of a two stage development. We will follow this <br />request very shortly with a plan to develop the property to the adjacent north <br />with a retail and office development <br />£0'd 0£0*on 96.SZ 130 3TIl-£9Z-03£:ai NoiionaisNOD to
The URL can be used to link to this page
Your browser does not support the video tag.