My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-15-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
07-15-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 3:12:51 PM
Creation date
9/13/2023 3:07:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 12, 1996 <br />Page 8 <br />#2154 John O’Sullivan. 2380 Shadvwood Road - Sketch Plan Review <br />finalizing design details on the stormwater pond. The formal application <br />must provide proper pond sizing and design parameters to meet City <br />standards. Note that the site plans submitted show a conflict between the <br />pond and the proposed auto teller functions, which will be resolved. (Sec <br />site grading comments below). <br />Height: Building height is limited to 30' as measured per code. Information as <br />to defined height of the building has not been required for purposes of <br />this conceptual review. <br />2.General Performance Standards <br />- Parking: Bank and professional office uses require one parking space per each <br />200 s.f of floor area, retail uses require one space per each 150 s.f net <br />area. As presented, the office/retail side of the building is 2 floors <br />9,750 s.f and the bank is 1 floor ,x 4,300 s.f, resulting in an estimated <br />23.800 gross square footage. For the sake of discussion, assuming 85% <br />of this is definable as net floor eirea (i.e. not including hallways, utility <br />space and storage areas), .85,x23,800 = 20.230/200 = 101.15, or potentially <br />requiring in the range of 100-110 parking stalls. Only 68 stalls are <br />provided on the plan. Although the restaunuit and bank parking lots are <br />joined under the submitted plan, Orono Code Section 10.61 Subd. 6 <br />disallows the use of 'double credit ’ for joint parking uses. The current <br />plan would appear, absent more detailed information, to have inadequate <br />parking for the size of buildings shown. <br />Parking and access layout are being reviewed by the City Engineer and <br />his preliminary comments are expected to be available for the July 15 <br />meeting. Parking design is subject to the requirements of Section 10.61, <br />Subd. 4 thru 10. Access locations arc subject to the approval of <br />Hennepin County Public Works Dept. <br />Hardcover : The northerly 1/3 of the parcel and the southwesterly side of the <br />parcel are located within 1,000 feet of Lake Minnetonka and are subject <br />to a maximum of 35% hardcover per the Shoreland Ordinance. Absent <br />formal hardcover calculations, it appears that both these areas are proposed <br />to be significantly in excess of the hardcover standards. Is there any <br />justification for the applicant to request hardcover variances? <br />Signage: Shall be subject to the requirements of Section 10.61, Subd. 1 and 3. <br />Staff will recommend that no front footage credit be given for the Olive <br />Avenue frontage in calculating signage allowance. <br />- Lighting: Fomial application submittal should include a lighting plan for the site. <br />- Lot Coverage bv Structures: All properties in the City are subject to a 15% <br />limit on lot coverage by structures. The site is approximately 75,000 s.f <br />without the vacated Navarre Lane, 85,000 s.f with the vacation. Bank <br />i
The URL can be used to link to this page
Your browser does not support the video tag.