Laserfiche WebLink
Zoning File #2107 <br />Februarj' 14,1996 <br />Page 5 <br />problems for the site. During the review of the O’Sullivan project, the City decided against <br />amending the Code to create standards for the multiple use but preferred to allow the area limitations <br />of the property to restrict multiple uses and any expansion of those uses. The City recently reviewed <br />an intensification in food serv ice at the convenience store at O’Sullivans and approved a walk-up <br />window to serve customers at the exterior of the building. The propertv' consists of 66,000 s.f. <br />Required area for the B-l zoning district is 20.000 s.f. for a principal use. One may argue that there <br />is adequate area to serv’e three principal uses on the site. <br />Review of Variances <br />fhe car wash structure does not meet the required setback of 35’, proposed at 5’, Parking along the <br />side lot line adjacent to the church propert>', a residentially zoned property, does not meet the <br />required 10' setback. One might argue that the parking adjacent to the side street should meet the <br />same 20’ setback as for front yard. The Code only references parking adjacent to residential and does <br />not deal with a more restrictive standard for a side street yard. Parking can be as close as 3. <br />Members are asked to review Section 10.61, Subd. 5 (A & B). A lot coverage variance will be <br />required as property is less than 1.99 acres in area. It is shown at 20.2% where the Code would <br />allow 15?^. <br />The majority of the 33’ of area to be vacated will consist of utility easements. Note the dumpster <br />enclosure would not be permitted within an easement area but parking and drives would be allowed. <br />Note along the side lot line adjacent to the church property, extensive filling along that portion of <br />the property will require a retaining wall. This may also be an issue in light of the existence ot <br />utilities that may need to be accessed. The Code has requirements for landscape/yard/green areas. <br />There is little of that shown on this busy site. <br />Gradimi^Drainage <br />Proposed and existing topography should be shown on one grading plan that should also include <br />building locations, elevations and erosion control to be used during construction. One-third of the <br />property’s drainage will drain to a proposed underground storm sewer to the residential property to <br />the northeast. The retention pond will treat and retain runoff before it enters the DNR and Orono <br />designated wetland just to the east of the subject propertv-. .Approximately nvo-thirds ot the surface <br />runoff from the site will drain to the southeast comer and eventually to the same DNR wetland to <br />the east No retention or treatment is provided. The current laws will not allow runoft from a <br />commercial site to drain directly into a protected wetland. Drainage ponding calculations should be <br />provided once the final extent of uses on the site have been resolved. <br />J