Laserfiche WebLink
Request for Council Action Continued <br />page 2 of 2 <br />November 20, 1996 <br />Preliminary Plan For Bracketts Point Curve (County Road 15) Roadway Reconstruction <br />Project -Public Information Meeting <br />Benefits versus Costs <br />Although the revised layout does provide for the addition of 8’ shoulders on each side of the <br />roadway, it does not provide for any straightening of the curve itself. The design would provide <br />some increased safety but less than initially anticipated. On the other hand the cost of the <br />project has increased substantially beyond the level anticipated. Both the County and the City <br />need to determine whether the benefits of the project are sufficient to warrant the substantially <br />higher costs. <br />COUNCIL ACTION REQUESTED: <br />Motion to provide direction to the County as to whether they should move forward with the <br />roadway reconstruction project as reflected in the revised preliminary plan.