My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1996 Council Packet
Orono
>
City Council
>
1996
>
10-28-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 1:30:43 PM
Creation date
9/5/2023 1:26:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />4^ <br />this change reduced the maximum building <br />height by approximately nine feet, and <br />reduced the area of the north building <br />face <br />this change also fit Gerry Timm's <br />concerns about building size <br />we have worked hard on the architectural <br />detailing of the building's north face, to <br />provide relief for the building's apparent <br />scale <br />we have taken the single story team room and <br />zamboni area sleeve, which runs along the <br />east side of the building, and extended it to <br />the north, eight feet past the higher arena <br />portion of the building <br />that evtension also helps to break up <br />the building's north side <br />we have eliminated one of the two original <br />sets of double doors on the north side <br />we have been aggressive in our landscape plan <br />for the north sMe of the project, and <br />carried that h. / landscaping all the way to <br />the west propel line
The URL can be used to link to this page
Your browser does not support the video tag.