Laserfiche WebLink
r <br />4^ <br />this change reduced the maximum building <br />height by approximately nine feet, and <br />reduced the area of the north building <br />face <br />this change also fit Gerry Timm's <br />concerns about building size <br />we have worked hard on the architectural <br />detailing of the building's north face, to <br />provide relief for the building's apparent <br />scale <br />we have taken the single story team room and <br />zamboni area sleeve, which runs along the <br />east side of the building, and extended it to <br />the north, eight feet past the higher arena <br />portion of the building <br />that evtension also helps to break up <br />the building's north side <br />we have eliminated one of the two original <br />sets of double doors on the north side <br />we have been aggressive in our landscape plan <br />for the north sMe of the project, and <br />carried that h. / landscaping all the way to <br />the west propel line