My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-1996 Council Packet
Orono
>
City Council
>
1996
>
05-13-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 10:12:05 AM
Creation date
9/5/2023 10:07:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 6. Chapter 12 of the Municipal Code of Orono is hereby amended by amending Section <br />12.30 Subd 2, Def 10(c) iii as follows <br />iii "Non -Conforming System" "Non-Compliant System" - <br />A prohibited system, a system located within a designated 100-year flood plain, any system which <br />mav or mav not meet all the location, design, or construction standards of the current Citv codes and <br />which is failing for any reason, and any system with less than 3 feet of unsaturated soil or sand <br />between the distribution device and the limiting soil characteristics <br />Section 7. Chapter 12 of the Municipal Code of Orono is hereby amended by amending Section <br />12 30 Subd 4 D 1 as follows <br />1 "Alternative systems" shall not be permitted e.xcept by variance The permit <br />application must include an explanation why a "standard system" is not feasible, include evidence <br />that the proposed method of treatment w ill be effective, and provide a monitoring plan to confirm <br />that the system is functioning properly <br />Section 8. Chapter 12 of the Municipal Code of Orono is hereby amended by amending Section <br />12 30 Subd 4 F as follow s <br />F Building Permit Applications No building permit shall be issued by <br />the City for any new building which that will be connected to a rrew m on-sitc sewage treatment <br />system until the site evaluation report and an on-site system design specification s as required by the <br />MPCA Regulations Chapter 708 0 and the City Code have has been reviewed and approved bv the <br />City No building permit shall be issued for any construction within a designated drainfield site <br />(within the setback from said drainfield site) until another drainfield site is approved bv the City. <br />Where the construction of additional bedrooms, bathrooms, installation of mechanical equipment. <br />or other factors likely-to -affec-t- mechanical equipment likely to affect the operation of the system <br />can be reasonably anticipated, the installation of a system for such anticipated need shall be required <br />on-site system must be confirmed as beinu of adequate capacity for the anticipated use If <br />expansion or replacement of the on-site system is required, an on-site system design must be <br />approved bv the Citv prior to issuance of the building permit Where construction on an existing <br />building can reasonably be anticipated to increase the sewage output for whatever reason, an <br />alternate site or future expansion area (if available^ must be designated and protected No building <br />permit -sliall be issued unless primary and alternate drainfield sites have been tested and approved <br />No building permit or plumbing permit-^hall be issued by the City for any expansion or-a lteration <br />of a building or use connected to an existing on -site system, until such system has been inspected <br />and certified by the City as being in compliance with this Section —Whenever- the addition of <br />bedrooms or -plumbing-fixturcs, or a change-in the character or intensity of the established use is <br />propo sed, the City may require the review and/or replacement, repair, alteration or expons io n-o f the <br />existing ' system or any port ion thereof - <br />Section 9. Chapter 12 of the N'unicipal Code of Orono is hereby amended by deleting Section <br />12 30 Subd 4 G and replacing it as follows <br />G_ Conditional Use Permit and Zoning V^ariance Applications No conditional <br />use permit or zoninu variance application shall be approved for a property until the existing on-site <br />sewage treatment system has been confirmed as beinu of adequate capacity for the anticipated use
The URL can be used to link to this page
Your browser does not support the video tag.