Laserfiche WebLink
Zoning File #2107 <br />February 14, 1996 <br />Page 5 <br />problems for the site. During the review of the O'Sullivan project, the City decided against <br />amending the Code to create standards for the multiple use but preferred to allow the area limitations <br />of the property to restrict multiple uses and any expansion of those uses. Fhe Cit\- recently reviewed <br />an intensification in food service at the convenience store at O Sullivans and approved a walk-up <br />window to serve customers at the exterior of the building. The property consists of 66,000 s.f. <br />Required area for the B-1 zoning district is 20,000 s.f. for a principal use. One may argue that there <br />is adequate area to serve three principal uses on the site. <br />Review of Variances <br />The car wash structure does not meet the required setback of 35', proposed at 5 ’. Parking along the <br />side lot line adjacent to the church property, a residentially zoned property, does not meet the <br />required 10' setback. One might argue that the parking adjacent to the side street should meet the <br />same 20* setback as for front yard. The Code only references parking adjacent to residential and does <br />not deal with a more restrictive standard for a side street yard. Parking can be as close as a. <br />Members are asked to review Section 10.61, Subd. 5 (A «S: B). A lot coverage variance will be <br />required as property is less than 1.99 acres in area It is shown at 20.2% where the Code would <br />allow 15%. <br />The majoritv of the 33' of area to be vacated will consist of utility easements. Note the dumpster <br />enclosure would not be permitted within an easement area but parking and drives would be allowed. <br />Note along the side lot line adjacent to the church property, extensive filling along that portion of <br />the propertv will require a retaining wall. This may also be an issue in light of the existence of <br />utilities that may need to be accessed. The Code has requirements for landscape/yard/green areas. <br />There is little of that shown on this busy site. <br />Cirading/Drainatie <br />Proposed and existing topography should be shown on one grading plan that should also include <br />buildinc locations, elev ations and erosion control to be used during construction. One-third of the <br />property's drainage will drain to a proposed underground storm sewer to the residential property to <br />the northeast. The retention pond will treat and retain runoff before it enters the DNR and Orono <br />designated wetland just to the east of the subject property. Approximately two-thirds of the surface <br />runoff from the site will dram to the southeast comer and eventually to the same DNR wetland to <br />the east. No retention or treatment is provided. The current laws will not allow runoff from a <br />commercial site to drain directly into a protected wetland. Drainage ponding calculations should be <br />provided once the final extent of uses on the site have been resolved.