My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-1997 Council Packet
Orono
>
City Council
>
1997
>
04-14-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:26:20 PM
Creation date
7/31/2023 3:20:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. * <br />1/1 Bonestroo <br />Rosene <br />Anderlik& <br />I Associates <br />Engineers & Architects <br />January 31,1997 <br />Bonestroo, Rosene, Anderlik 9nd Associates. Inc. Is an Affirmative Action/Equat Opportunity Employer <br />Principals Ouo G Bonestroo. PE • Joseph C. Anderlik. RE. • Marvin L. Sorvala. P.E. • <br />Richard E. Turner. P.£. • Glenn R Cook. PI. • Thomas E Noyes. PE. • Robert G Schunicht. PE. • <br />Jerry A. Bourdon. P.E. • Robert W Rosene. RE and Susan M Eberim. C PA. Senior Consultants <br />Associate Principals. Howard A. Sanford. PE • Keith A Gordon. FI. • Robert R. Pfefferle. PE. • <br />Richard W. Foster. PE • David O Loskota. PE • Robert C. Russek. AI A. • Mark A. Hansoa PI. • <br />Michael T. Rautmann. PI • Ted K.Field. PI. • Kenneth P. Anderson. PI. • Mark R. Rolfs. RE. • <br />Sidney R VX/illiamson. PE.. L.S. • Robert F. Korsmlth <br />Offices: St Paul. Rochester. Willmar and St Cloud. MN • Mequon. Wl <br />Mr. Greg Gappa, P.E. <br />Director of Public Services <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN 55323-0066 <br />Re: Antoine Park Buildings <br />Our File No. 139Gen <br />Dear Greg: <br />^^6 i »99; <br />CITY OF oao/vo <br />This letter is a follow up to the site visit on January 27, 1997 to look at the two existing park <br />buildings. The two building were constructed at different times with a few feet separating the <br />buildings. <br />The westerly building is to be an old horse bam that is currently being used for storage. The east <br />end of the building is open on the south side with a steel column in the center of the opening. <br />The masonry walls of the building have numerous large cracks throughout the building. <br />The roof of the bam portion is 2 x 4 joists spaced at 2-0 ” oicenter. The roof of the open structure <br />is 2 X 6 joists spaced at r-4’on center with a maximum span of 14 feet. Neither the 2 x 4 roof <br />joists or 2 X 6 roof joist with the existing spans are capable of carrying the current design snow <br />load of 40 pounds per square foot. <br />Several of the roof boards and roof joists have rotted and are in need of replacement. The roof <br />joists on the east side of the building are supported on a steel beam on the south side, i.e. the <br />open side. The steel beam has bowed out approximately 3 to 4 inches because there are no <br />horizontal ties going from one side of the building to the other side of the building. It was also <br />observed that the steel beam and steel column have been painted. While no tests have been <br />performed on the paint, it is very likely that the paint contains lead. If these members are <br />repainted, special precautions would need to be taken to contain, collect and dispose of the paint <br />chips when they are removed. <br />The easterly building has concrete block walls with a wood truss roof, wood deck boards and <br />shingles. Some of the deck and fascia boards are rotted. Structural members in four of the <br />trusses have been removed or cut. In order for the roof structure to meet current building code <br />design standards, the four damaged tmsses should be repaired or replaced. <br />2335 West Highway 36 - St. Paul. MN 55113-3898 - 612-636-4600
The URL can be used to link to this page
Your browser does not support the video tag.