My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-1997 Council Packet
Orono
>
City Council
>
1997
>
04-14-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:26:20 PM
Creation date
7/31/2023 3:20:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />Mr. Greg Gappa, P.E. <br />Director of Public Services <br />January 31,1997 <br />Page! <br />Re: Antoine Park Buildings <br />Based on the site observations and the requirements of the current building codes both buildings <br />would require extensive work to bring them up to current standards and be structurally sound. If <br />the easterly building were to be repaired with the necessary structural modifications, replace the <br />shingles and paint the building, the approximate cost is $10,000. There is no economical way to <br />repair or rehabilitate the westerly building. <br />As an option to upgrading these building, a new free standing park shelter could be considered. <br />For a hexagon park building with a 30 foot diameter, 585 square feet, constructed of wood and a <br />concrete slab, the approximate cost 314,000. For a 40 foot diameter building, 1,040 square feet, <br />the approximate cost is $23,000. Enclosed is a copy of a brochure showing the hexagon parks <br />building. <br />If you have any questions on this matter, please call me at 604-4760. <br />Sincerely, <br />BQNESTROO, ROSENE, ANDERLK & ASSOCIATES, INC. <br />JDPicv <br />Enclosure <br />cc: Glenn Cook
The URL can be used to link to this page
Your browser does not support the video tag.