My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-24-1997 Council Packet
Orono
>
City Council
>
1997
>
03-24-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:16:37 PM
Creation date
7/31/2023 3:10:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestrool <br />^gltosene <br />Ai)(ieriB(& <br />^Associates <br />bidinMn 4 AitMiKti <br />Project Name Lift Station No. 6 Renovation <br />Project No.File No. 13981 <br />Bid Opening 11:00 a.m., C.S.T., Thursday, March 13, 1997 Owner CityofOrono <br />/ hereby certify that this is an exact <br />reproduction of bids received. <br />y^/n Pajj UK <br />Karen A. Cavett. P.E, Registration No. 25069 <br />BID TABULATION <br />Tabulation of Five Low Bids of Five Received <br />No. Item UnitQty. <br />Bid No. 1 <br />Great Western <br />Corporation <br />Bid No. 2 <br />S.M. Hentges <br />& Sons, Inc. <br />Bid No. 3 <br />Ford <br />Constrretion Co., Inc. <br />Bid No. 4 <br />Penn <br />Contracting, Inc. <br />Bid No. 5 <br />GHT <br />Constniction, Inc <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Base Bid - Lift Station Renovation » <br />1 Install sod SY 50 8.78 439.00 10.00 500.00 4.50 225.00 3.50 175.00 4.00 200.00 <br />2 Place 8* granular base CY 50 20.27 1,013.50 7.00 350.00 20.00 1.000.00 43.00 2.150.00 20.00 1.000.00 ' <br />3 Place 3* bituminous drive CY 50 67.56 3,378.00 13.00 650.00 40.00 2.000.00 120.00 6.000.00 45.00 2.250.00 <br />4 Provide temporaiy controls, pumps and • <br />piping for intenn conveyance LS 1 6.350.48 6.350 48 5.200.00 5,200.00 9.000.009.000.00 3.450.00 3.450.00 7.654.00 7.654.00 <br />5 Provide lift station demolition LS 1 5.090.33 5.090.3317.300.00 17.300.00 5.000.005.000.00 3,750.00 3,750.00 20,690.00 20.690.00 <br />6 Install new pumps, piping, valves, top <br />hatch and slab per Section 11306 LS 1 40.454.76 40.454.76 32.840.00 32.840.00 40,700.0040.700.00 37.450.00 37.450.0044.772.00 44.r2.00 <br />7 Install new control panel, base slab, dialer <br />etc. per Section 16903 LS 1 29.33640 29.336.40 31.500.00 31.500.00 31.000.00 31.000.00 39.570.00 39.5/0.00 27.931.00 27,931.00 <br />Total Base Bid $86,062.47 588.340.00 t 588.925.00 592.545.00 $104,497.00 <br />Alternate Equipment Bids <br />1 Item Pumps Sl Controls Pumps A Controls Pumps/Controls Pumps Control Panel <br />Manufacturer Myers/Tri State Myers/Milltronics Myers/Milltronics ABS Professional Control Products <br />Deduct ($10,000.00)($12,000.00)(SI 0.000.00)($3,000.00)($6,700.00) <br />2 Item Pumps/Controls Panel <br />Manufacturer ABS/Professional Professional Control Products <br />Deduct ($7,500.00)($6,000.00) <br />Firm Great Western Corporation S.H. Hentges A Sons. Inc.Ford Construedon. Inc.Penn Contracting, Inc.GHT Coni traction. Inc. <br />Address 8101 ScandiaTr 650 Quaker Av 13025 Central Av NE 2750 102nd St SE <br />City. State. Zip Forest Lake MN 55025 Jordan MN 55352-0069 Excelsior MN 55331-0667 Blaine MN 55434 Delano MN 55328 <br />Phone Not Provided 612.492.5700 612.470.9530 612.767.2141 612.955.3826 <br />Fax Not Provided 612.492.5705 612.470.9631 612.767.2545 612.955.2083 <br />By Waller B. Boorsma Steven M. Hentges Lance R. Ford Wesley Crawford G.H. Theisen <br />Tide President President President Vice President President <br />5% Bid Security Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond • <br />Addenda Acknowledged 1.2.3 1.2.3 i.2.3 1.2.3 1.2.3 <br />l398tBT.WB2
The URL can be used to link to this page
Your browser does not support the video tag.