Laserfiche WebLink
street Reconstruction <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. UNIT <br />QUANTITY PRICE <br />Clearing and grubbing <br />Driveway restoration <br />Sawcut bituminous <br />Remove bituminous <br />Common excavation <br />Subgrade preparation <br />Cl. 5 aggregate base <br />Type 31 bituminous base course <br />Type 41 bituminous wear course <br />Bituminous material for tack <br />Silt fence <br />Sodding with topsoil <br />Seeding w/topsoil, mulch, fertilizer <br />Landscaping <br />GeotextIle fabric ________ <br />LS <br />SY <br />LF <br />SY <br />CY <br />SY <br />TN <br />TN <br />TN <br />GL <br />LF <br />SY <br />AC <br />LS <br />SY <br />1 <br />600 <br />250 <br />4.500 <br />1,800 <br />4,400 <br />2.500 <br />525 <br />400 <br />325 <br />900 <br />10,000 <br />0.40 <br />1 <br />4,400 <br />2,000.00 <br />15.00 <br />1.00 <br />2.00 <br />5.00 <br />1.00 <br />12.00 <br />29.00 <br />31.00 <br />2.00 <br />2.00 <br />2.00 <br />3,000.00 <br />10,000.00 <br />1.25 <br />2,000 <br />9,000 <br />250 <br />9,000 <br />9,000 <br />4,400 <br />30.000 <br />15,225 <br />12,400 <br />650 <br />1,800 <br />20.000 <br />1,200 <br />10,000 <br />5,500 <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$130,425 <br />6,521 <br />$136,946 <br />20,542 <br />$157,488 <br />7,874 <br />$165,363 <br />13990APP.WB2