My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1997 Council Packet
Orono
>
City Council
>
1997
>
03-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:08:57 PM
Creation date
7/31/2023 3:05:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A <br />CITY OF ORONO <br />BRACKETTS POINT <br />SANITARY SEWER IMPROVEMENTS <br />FILE NO. 13990 <br />Lateral Sanitary Sewer <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />13990APP.WB2 A-1 <br />EST. <br />COST <br />8" PVC, SDR 35, 0'-8'deep LF 740 $20.00 $14,800 <br />8" PVC, SDR 35, 8'-10'deep LF 215 22.00 4,730 <br />8" PVC, SDR 35,10'-12 ’deep LF 910 24.00 21,840 <br />8" PVC, SDR 35,12'-14' deep LF 7r 5 26.00 19,630 <br />8“ PVC, SDR 35, 14'-16 ‘ deep LF 275 28.00 7,700 <br />8" PVC, SDR 35, 16 ’-18' deep LF 130 30.00 3,900 <br />Improved pipe foundation, per 6" inc.LF 3,025 1.20 3,630 <br />Mechanical trench compaction LF 3,025 1.00 3,025 <br />Standard sanitary manhole EA 14 1,500.00 21,000 <br />Manhole overdepth LF 35.6 100.00 3,560 <br />8“ X 4" wye EA 15 40.00 600 <br />Residential lift station EA 1 3,000.00 3,000 <br />4“ PVC, SDR 35, sewer sen/ice LF 450 10.00 4,500 <br />$111,915 <br />5,596 <br />$117,511 <br />17,627 <br />$135,137 <br />6,757 <br />$141,894
The URL can be used to link to this page
Your browser does not support the video tag.