Laserfiche WebLink
Lift Station and Forcemain <br />PRELIMINARY COST ESTIMATE <br />EST.UNIT EST. <br />ITEM UNIT QUANTITY PRICE COST <br />Lift station EA 1 75,000.00 75,000 <br />4" PVC, DR25 forcemain LF 600 12.00 7,200 <br />Landscaping LS 1 5,000.00 5,000 <br />Sodding with topsoil SY 200 2.50 500 <br />Connect to existing force main EA 1 5,000.00 5,000 <br />Estimated Construction Cost $92,700 <br />+5% contingencies 4,635 <br />$97,335 <br />+15% design, inspection, admin 14,600 <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$111,935 <br />5,597 <br />$117,532 <br />13990APP.WB2 A-3