Laserfiche WebLink
Lift Station and Forcemain <br />PRELIMINARY COST ESTIMA TE <br />ITEM <br />EST.UNIT <br />UNIT <br />EST. <br />Lift station EA 1 90,000.00 90,000 <br />4" PVC, DR25 forcemain <br />4" PVC, DR 25 forcemain- <br />LF 1,740 12.00 20,880 <br />directlonal bore LF 125 40.00 5,000 <br />Connect to existing gravity sewer EA 1 500.00 500 <br />Transplant tree EA 2 300.00 600 <br />Sodding with topsoil SY 650 2.00 1,300 <br />Seeding w/topsoil, mulch, fertilizer AC 0.50 3,000.00 1,500 <br />Landscaping LS 1 3,000.00 3,000 <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$122,780 <br />6,139 <br />$128,919 <br />19,338 <br />$148,257 <br />7,413 <br />$155,670 <br />13991APP.WB2 A-2