Laserfiche WebLink
Lift Station and Forcemain - Aiternate <br />PRELiMINARY COST ESTIMATE <br />! <br />ITEM <br />EST. UNIT <br />UNIT QUANTITY PRICE <br />EST. <br />COST <br />Lift station EA 1 90,000.00 $90,000 <br />4" PVC, DR25 forcemain <br />4" PVC, DR 25 forcemain- <br />LF 1,250 12.00 15,000 <br />directional bore LF 60 40.00 2,400 <br />Connect to MCES forcemain EA 1 5,000.00 5,000 <br />Transplant tree EA 2 300.00 600 <br />Sodding with topsoil SY 650 2.00 1,300 <br />Seeding w/topsoii, mulch, fertilizer AC 0.50 3,000.00 1,500 <br />Landscaping LS 1 3,000.00 3,000 <br />Estimated Construction Cost <br />+5% contingencie- <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />13991APP.WB2 B-1 <br />$118,800 <br />5,940 <br />$124,740 <br />18,711 <br />$143,451 <br />7,173 <br />$150,624