My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1997 Council Packet
Orono
>
City Council
>
1997
>
03-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:08:57 PM
Creation date
7/31/2023 3:05:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A <br />CITY OF ORONO <br />BAY RIDGE <br />SANITARY SEWER IMPROVEMENTS <br />FILE NO. 13991 <br />Lateral Sanitary Sewer <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />8" PVC, SDR 35, O’-8'deep LF 325 $20.00 $6,500 <br />8" PVC, SDR 35, 8’-10'deep LF 755 22.00 16,610 <br />Improved pipe foundation, per 6" inc.LF 1,080 1.20 1,296 <br />Mechanical trench compaction LF 1,080 1.00 1,080 <br />Standard sanitary manhole EA 3 1,500.00 4,500 <br />Manhole overdepth LF 3.1 100.00 310 <br />8" X 4" wye EA 8 40.00 320 <br />4" PVC, SDR 35, sewer service LF 240 10.00 2,400 <br />Silt fence LF 1,500 2.00 3,000 <br />Sodding w/topsoil SY 4,500 2.00 9,000 <br />Clearing and grubbing LS 1 5,000.00 5,000 <br />Remove and replace fence LF 200 10.00 2,000 <br />Landscaping LS 1 15,000.00 15,000 <br />Estimated Construction Cost <br />+5% contingencies <br />-♦15% design, inspection, admin <br />-♦•5% capitalized interest & bonding <br />Total Estimated Cost <br />13991APP.WB2 A-1 <br />$67,016 <br />3,351 <br />$70,367 <br />10,555 <br />$80,922 <br />4,046 <br />$84,968 <br />afiSiaSS
The URL can be used to link to this page
Your browser does not support the video tag.