Laserfiche WebLink
r ' “ <br />GlTYof ORONO <br />Municipal Offices <br />Street Address: <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Mailing Address: <br />P.O. Box 66 <br />Crystal Bay. MN 55323-0066 <br />February 24,1997 <br />Dear Residents of the Bracketts Point Neighborhood: <br />The City Engineer has completed a Feasibility Report concluding that construction of sanitary sewer <br />and force main to ser\e your neighborhood is feasible from an engineering standpoint. The <br />proximity of Bracketts Point to Lake Minnetonka is the primary factor suggesting municipal sewer <br />service is preferable to long term septic system usage. In 1995 a neighborhood meeting was held <br />to discuss the possibilities of sewer, and a majority of Bracketts Point residents signed a petition <br />requesting municipal sewer. Bracketts Point was recently approved by the Metropolitan Council for <br />inclusion within the Metropolitan Urban Service Area (MUSA). <br />The proposed project involves the construction of sanitary sewer laterals and trunk facilities, and <br />associated street resurfacing. Costs of the project are summarized in the table below. There are 15 <br />(possibly 16) units in the Bracketts Point Area proposed to be assessed for the improvements. As <br />noted during the neighborhood meeting held July 20,1995, the City will not be contributing toward <br />the cost of these improvements. The anticipated project schedule is as follows: <br />March 10, 1997 <br />March 10, 1997 <br />May, 1997 <br />May, 1997 <br />June, 1997 <br />June, 1997 <br />July, 1997 <br />July, 1997 <br />October, 1997 <br />Public hearing <br />Order preparation of plans and specifications <br />Plans and specifications complete <br />Advertise for bids <br />Open bids <br />Assessment hearing <br />Award construction contract <br />Begin construction <br />Complete construction <br />If you have questions regarding this project, please contact City staff at 473-7357. <br />Table 1. Cost Summary <br />Item Estimated Cost <br />Trunk Facilities $117,532 <br />Sanitary Sewer Laterals $141,894 <br />Street Surfacing $165,363 <br />Total $424,789