Laserfiche WebLink
Lift Station and Forcemain <br />PRELIMINARY ESTIMA TE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Lift station EA 1 75,000.00 75,000 <br />4" PVC, DR25 forcemain LF 1,300 20.00 26,000 <br />4" HOPE fm - directional bore LF 1,910 40.00 76,400 <br />Connect to ex. manhole EA 1 1,000.00 1,000 <br />8" PVC, SDR 35, 8'-10’deep LF 80 24.00 1,920 <br />Standard sanitary manhole EA 1 1,500.00 1,500 <br />Remove and replace culvert LF 150 20.00 3,000 <br />Clearing and grubbing LS 1 2,000.00 2,000 <br />Seeding wAopsoil, mulch, fertilizer AC 0.26 3.000.00 780 <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$187,600 <br />9,380 <br />$196,980 <br />29,547 <br />$226,527 <br />11,326 <br />$237,853 <br />13989APPX-A.WB2 B-3