My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Packet
Orono
>
City Council
>
1997
>
01-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:16:51 PM
Creation date
7/31/2023 2:15:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />LONG LAKE COUNTRY CLUB <br />TRUNK FACILITIES <br />FILE NO. 13989 <br />Lift Station & Forcemain Alternate <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Lift station EA 1 75,000.00 $75,000 <br />4" PVC, DR25 forcemain LF 1,300 20.00 26,000 <br />4" HOPE fm - directional bore LF 680 40.00 27,200 <br />Connect to existing manhole EA 1 1,000.00 1,000 <br />8" PVC, SDR 35, 8'-10'deep LF 80 24.00 1,920 <br />Standard sanitary manhole EA 1 1,500.00 1,500 <br />Remove and restore driveways SY 470 16.00 7,520 <br />Clearing and grubbing LS 1 2,000.00 2,000 <br />Remove and replace culvert LF 40 20.00 800 <br />Sodding with topsoil SY 2,500 2.50 6,250 <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$149,190 <br />7,460 <br />$156,650 <br />23,497 <br />$180,147 <br />9,007 <br />$189,154 <br />13989/PPX-A.WB2 B-4
The URL can be used to link to this page
Your browser does not support the video tag.