Laserfiche WebLink
street Reconstruction <br />PRELIMINARY COST ESTIMATE <br />ITEM <br />EST. <br />QUANTITY <br />Clearing and grubbing <br />Remove and replace culvert <br />Sawcut bituminous <br />Remove bituminous <br />common excavation <br />Subgrade preparation <br />Cl. 5 aggregate base <br />Type 31 bituminous ba«® .jourse <br />Type 41 bituminous w. u course <br />Bituminous material for tack <br />Silt fence <br />Sodding with topsoil <br />Seeding w/topsoil. mulch, fertilizer <br />LS <br />LF <br />LF <br />SY <br />CY <br />SY <br />TN <br />TN <br />TN <br />GAL <br />LF <br />SY <br />AC <br />1 <br />170 <br />300 <br />5,980 <br />1,660 <br />7080 <br />3,570 <br />720 <br />540 <br />300 <br />500 <br />2,130 <br />0.23 <br />4.000. 00 <br />20.00 <br />1.00 <br />2.00 <br />5.00 <br />1.00 <br />12.00 <br />29.00 <br />31.00 <br />2.00 <br />2.00 <br />2.50 <br />3.000. 00 <br />4.000 <br />3,400 <br />300 <br />11,960 <br />8,300 <br />7,080 <br />42,840 <br />20,880 <br />16,740 <br />600 <br />1.000 <br />5,325 <br />690 <br />Estimated Construction Cost <br />+5% contingencies <br />$123,115 <br />6,156 <br />+15% design, inspection, admin <br />$129,271 <br />19,391 <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$148,661 <br />7,433 <br />$156,094 <br />13989APPX-A.WB2 B-2 <br />L