Laserfiche WebLink
Lift Station and Forcemain <br />PREUMINARY COST ESTIMATE <br />i'. >’, <br />EST.UNIT <br />ITEM <br />Lift station <br />4" PVC, DR25 forcemain <br />Transplant tree <br />Remove and replace culvert <br />Clearing and grubbing <br />Sodding with topsoil <br />Seeding w/toosoil. mulch, fertilizer <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />13989APPX-A.WB2 A-3 <br />EST. <br />UNIT QUANTITY PRICE COST <br />EA 1 75,000.00 75,000 <br />LF 2920 20.00 58,400 <br />EA 5 200.00 1,000 <br />LF 50 20.00 1,000 <br />LS 1 2,000.00 2,000 <br />SY 350 2.50 875 <br />AC 0.26 780 <br />$139,055 <br />6,953 <br />$146,008 <br />21^01 <br />$167,909 <br />8,395 <br />$176,304