Laserfiche WebLink
CITY OF ORONO <br />NORTH LONG LAKE <br />TRUNK FACILITIES <br />FILE NO. 13989 <br />Lift Station & Forcemain Aiternate <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Lift station EA <br />4" PVC, DR25 forcemain LF <br />4" HOPE fm - directional bore LF <br />Clearing and grubbing LS <br />Sodding with topsoil SY <br />Seeding wAopsoil. mulch, fertilizer AC <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />1 <br />1,740 <br />1,240 <br />1 <br />1,250 <br />0.35 <br />75,000.00 <br />20.00 <br />40.00 <br />1,600.00 <br />2.50 <br />3,000.00 <br />$75,000 <br />34,800 <br />49,600 <br />1,600 <br />3,125 <br />1,050 <br />$165,175 <br />8,259 <br />$173,434 <br />26,015 <br />$199,449 <br />9,972 <br />$209,421 <br />13989APPX-A.WB2 A-4