Laserfiche WebLink
Street Reconstruction <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />Clearing and grubbing <br />Remove catch basin <br />2' X 3' catch basin w/sump <br />4' dia. storm manhole <br />manhole depth greater than 8' <br />12 “ RCP , Cl. 5 storm sewer <br />1 2“ flared end w/trash guard <br />Class 2 riprap <br />Remove and replace culvert <br />Sawcut bituminous <br />Remove bituminous <br />common excavation <br />Subgrade preparation <br />Cl. 5 aggregate base <br />Type 31 bituminous base course <br />Type 41 bituminous wear course <br />Bituminous material for tack <br />Silt fence <br />Sodding with topsoil <br />Seeding w/topsoil. mulch, fertilizer <br />LS <br />EA <br />EA <br />EA <br />LF <br />LF <br />EA <br />CY <br />LF <br />LF <br />SY <br />CY <br />SY <br />TN <br />TN <br />TN <br />GAL <br />LF <br />SY <br />AC <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />1 <br />1 <br />1 <br />1 <br />3.3 <br />200 <br />1 <br />12 <br />100 <br />250 <br />3,150 <br />1,350 <br />5,750 <br />3,250 <br />380 <br />290 <br />160 <br />500 <br />3,500 <br />0.26 <br />8,000.00 <br />200.00 <br />900.00 <br />1,200.00 <br />100.00 <br />22.00 <br />450.00 <br />35.00 <br />20.00 <br />1.00 <br />2.00 <br />5.00 <br />1.00 <br />12.00 <br />29.00 <br />31.00 <br />2.00 <br />2.00 <br />2.50 <br />3,000.00 <br />13989APPX-A.WB2 A-2 <br />EST. <br />COST <br />8,000 <br />200 <br />900 <br />1,200 <br />330 <br />4,400 <br />450 <br />420 <br />2,000 <br />250 <br />6,300 <br />6.750 <br />5.750 <br />39,000 <br />11 020 <br />8,990 <br />320 <br />1,000 <br />8.750 <br />780 <br />$106,810 <br />5,341 <br />$112,15 <br />16,823 <br />$128,973 <br />6,449 <br />$135,422