My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Packet
Orono
>
City Council
>
1997
>
01-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:16:51 PM
Creation date
7/31/2023 2:15:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. Sanitary Sewer <br />The proposed sanitary sewer for the North Long Lake area is shown on Figure 2. The proposed <br />sanitary sewer for the Long Lake Country Club areas is shown on Figure 3. From the review of the <br />project site, the routes shown on the figures are recommended from a construction standpoint. <br />The North Long Lake area would be served by construction of a lift station on Long Lake Boulevard <br />near the shore area of Long Lake. A force main would be installed along Long Lake Boulevard and <br />continue west along North Sixth Street where it would tie into a manhole in the Long Lake Country <br />Club area. Because of the steep slopes and difficulty to construct sanitary sewer along the lake, five <br />of the homes on the south side of Long Lake Boulevard will be served with grinder pumps and force <br />main to the gravity sewer. <br />An option to provide gravity sewer in the back of the lots along Long Lake using directional boring <br />is not economically feasible. If open-cut construction methods were to be used there would be too <br />many trees lost and a high ground water table along the lake may make the constniction cost <br />prohibitive. <br />Proposed storm sewer improvements for the North Long Lake area are also shown on Figure 2. The <br />existing catch basin on the north side of Long Lake Boulevard would be removed and a new catch <br />basin and manhole with a pipe extending towards the lake would be constructed. The upgrading of <br />the storm sewer will be completed in accordance with policies adopted in the comprehensive storm <br />sewer plan. <br />The Long Lake Country Club area would also be serve by construction of a lift station at the south <br />end of Lake View Terrace. A force main would be installed along Country Club Road and then <br />south along North Brown Road were it would tie into an existing manhole in the Sugarwood <br />Development. <br />Alternate layouts for the forcemain to serve North Long Lake and Long Lake Country Club are <br />shown on Figures 2 and 3. These layouts would reduce the project cost slightly. The drawback for <br />these two alternate layouts is the easements that would be required to construct the forcemains may <br />be difficult to obtain. <br />Sanitary Sewer Improvements <br />I
The URL can be used to link to this page
Your browser does not support the video tag.