Laserfiche WebLink
4 <br />\ <br />n. Summary and Recommendations <br />The construction of sanitary sewer and force main to serve North Long Lake and Long Lake Country <br />Club areas is feasible from an engineering standpoint. The project is necessary because of the <br />potential pollution problems to Long. Lake and the surrounding watershed. The capital cost as well <br />as operation and maintenance costs have been considered in determining that the project is cost <br />effective. The cost of these improvements are interrelated and should be assigned equitably between <br />all properties. The following recommendations are presented for consideration by the Orono City <br />Council: <br />1. <br />2. <br />3. <br />That this Report be adopted as the guide for installation of sanitary sewer the North <br />Long Lake and Long Lake Country Club areas. <br />That the City conduct a legal and fiscal review of the proposed project prior to the <br />public hearing. <br />That a public hearing be held on the proposed improvements. The following <br />estimates should be used for hearing purposes: <br />Table 1. Cost Summary <br />Item Estimated Cost <br />Trunk Facilities $414,157 <br />Lateral Facilities $616,114 <br />Dakota Avenue surfacing $19,284 <br />Total $1,049,555 <br />There are 52 units proposed to be assessed for the truri4 -nd lateral improvements, with an additional <br />3 units to be assessed for trunk charges. <br />Sanitary Sewer Improvements