My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Packet
Orono
>
City Council
>
1997
>
01-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:16:51 PM
Creation date
7/31/2023 2:15:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer service for each home in the two developments would consisting of a 4-inch PVC line. <br />Services will be extended to the property line. The property owners would be responsible for the <br />connection to the service. The City will provide grinder pump stations for the property owners that <br />cannot be served by gravity as or part of the overall project cost. The installation of the grinder <br />pump will be a rcsponsiblity of the property owner. <br />The project will generally be constructed within the right-of-way of existing streets, but the <br />alignments selected and shown on Figures 2 and 3 will require some permanent casements and <br />temporary easements to allow for construction. <br />The streets will be restored with 1 l/i inches of bituminous wear course, 2 inches of bituminous base <br />course, and 12 inches of aggregated base, 100 % crushed material. This was based on a roadway <br />axle design of 7 tons for lesidential streets. Currently, Dakota Avenue is a gravel street. A cost has <br />been included in the Appendices for paving Dakota Avenue. <br />Detailcid cost estimates for the sanitary sewer improvements are presented in the Appendices. <br />Sanitary Sewer Improvements <br />f- T- r M mm rriw^ i iii ^mr^rir-1
The URL can be used to link to this page
Your browser does not support the video tag.