My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2023 Council Packet
Orono
>
City Council
>
2023
>
06-12-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:49:04 PM
Creation date
6/27/2023 1:45:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: AMC Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain council approval to add design of the Partenwood <br />Forcemain replacement to the Tonkawa Force main replacement project. <br /> <br />2. Background. In January of 2022 Council approved the design of the Tonkawa Force Main <br />replacement project. During the design process we determined a large portion of the initial projected are <br />did no need to be replaced. This provides a funding opportunity to incorporate the adjoining Partenwood <br />force main in to the replacement project without increasing the overall construction budget. This is <br />especially timely as Partenwood road is slated for pavement replacement in 2024. Completing the force <br />main replacement is 2023 would ensure the new pavement in 2024 would not be impacted. <br /> <br />3. Scope of Work. Replacement of 1500 feet of forcemain along Partenwood Road. <br /> <br />4. Cost. Bolton and Menk has provided a not to exceed proposal of $33,500 to complete the design and <br />engineering for the project. The estimated cost for Partenwood sewer main replacement is $414,200. <br />This will bring the total Tonkawa Partenwood combined cost to $1,188,825. The original CIP amount <br />was $1,245,550. <br /> <br />5. Funding. The Partenwood forcemain replacement will be funded by a combination of the sanitary <br />sewer fund and ARPA funding. The projected 2023 year-end balance for the Sewer Fund is $1,176,080. <br /> <br />6. Staff Recommendation. I recommend approval of the proposals from Bolton and Menk and that <br />Council authorize staff to begin design and planning for this project. <br /> <br />COUNCIL ACTION REQUESTED: <br />Move to direct the City Engineer to move forward with incorporation of the Partenwood Forcemain <br />replacement in to the Tonkawa Force main replacement Project acceptance of the Bolton and Menk’s <br />proposal for design and engineering of the same. <br /> <br />Exhibits <br />A. Bolton and Menk Design Proposal <br /> <br /> <br />Item No.: 11 Date: June 12, 2023 <br />Item Description: Tonkawa-Partenwood Force main Replacement <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.